Activity 2: Studies

WP2.1 Transversal

ET0 NATIONAL POLICY FRAMEWORK
Description ET0 aims at drafting the National Policy Framework (NPF) as provided in the Directive 2014/94 on the deployment of alternative fuels infrastructure, with the emphasis on LNG.
Leader Puertos del Estado
Beneficiaries Dirección General de la Marina Mercante, Puertos del Estado
Deliverable Link to BOE-A-2016-11738 Real decreto, only Spanish

Link to National Policy Framework

Activity Description

Activity Update

ET1 STUDY TECHNICAL, SAFETY AND ENVIRONMENTAL SPECIFICATIONS ON LNG
Description Analyze operational procedures for LNG supply in different technologies, both in martime and port services in order to reach a set of tested specifications.
Leader Dirección General de la Marina Mercante
Beneficiaries Dirección General de la Marina Mercante, Puertos del Estado, Enagás, Reganosa
Deliverable / Supporting document Activity Update

Activity Description

Common Guidelines for LNG Bunkering at Spanish Ports Book I

Common Guidelines for LNG Bunkering at Spanish Ports Book II

ET2 STUDY ON LNG DEMAND AND SUPPLY CHAIN ANALYSIS FOR THE ROLL OUT (MEDITERRANEAN CORRIDOR)
Description Analyze potential LNG demand for transport and possible supply chains in the mediterranean corridor.
Leader Enagás
Beneficiaries Enagás, Puertos del Estado, Autoridad Portuaria de Barcelona, Autoridad Portuaria de Cartagena, Autoridad Portuaria de Valencia, Renfe
Deliverable/ Supporting document Link to Study of Demand – Bottom Up Analysis

Link to Study of Demand – Consolidation Top Down Bottom Up

Link to Study of Demand – Top Down Analysis

Link to ET2,3,4 Activity Description

Link to ET2,3,4 Activity Update

Link to Project info 1 LNG demand and supply logistics chain

Feasible and optimal Supply Chains

Investment plan (only Spanish)

Roll out Investment Plan (Only Spanish)

Demand (only Spanish)

Study on LNG Supply Logistic Chain

Impact on European corridors

ET3 STUDY ON LNG DEMAND AND SUPPLY CHAIN ANALYSIS FOR THE ROLL OUT (ATLANTIC CORRIDOR)
Description Analyze potential LNG demand for transport and possible supply chains in the atlantic corridor. Link to more info on ET2,3,4 Activity Description
Leader REN
Beneficiaries Enagás, REN, Puertos del Estado, Reganosa, Instituto Enerxético de Galicia, Autoridad Portuaria de Bilbao, Autoridad Portuaria de Santander, Autoridad Portuaria de Gijón, Renfe
Deliverable/ Supporting document Link to Study of Demand – Bottom Up Analysis

Link to Study of Demand – Consolidation Top Down Bottom Up

Link to Study of Demand – Top Down Analysis

Link to ET2,3,4 Activity Update

Link to Project info 1 LNG demand and supply logistics chain

Study on LNG Supply Logistic Chain

Feasible and optimal suply chains

Impact on European corridors

Informe WP2 Rollout (Only Spanish)

Informe WP3 (Only Spanish)

Demand (only Spanish)

ET4 STUDY ON LNG DEMAND AND SUPPLY CHAIN ANALYSIS FOR THE ROLL OUT (GIBRALTAR STRAIT & PERIPHERAL REGIONS)
Description Analyze potential LNG demand for transport and possible supply chains in the Gibraltar strait and peripheral regions. Link to more info of ET2,3,4 Activity Description
Leader Enagás
Beneficiaries Enagás, Puertos del Estado, Autoridad Portuaria de la Bahía de Algeciras, Autoridad Portuaria de Melilla, Autoridad Portuaria de Tenerife, Autoridad Portuaria de Cartagena, Autoridad Portuaria de Huelva, Cepsa, Renfe
Deliverable/ Supporting document Link to Study of Demand – Bottom Up Analysis

Link to Study of Demand – Consolidation Top Down Bottom Up

Link to Study of Demand – Top Down Analysis

Link to ET2,3,4 Activity Update

Project info 1 LNG demand and supply logistics chain

Study on LNG Supply Logistic Chain

WP2-3 Feasible and optinal supply chains

WP4 .Impact on European corridors

WP2 Investment Plan

Report WP2 Rollout (only Spanish)

Reposrt WP3 Rollout (Oly Spanish)

Master demand (only Spanish)

ET5 STUDY ON LNG SOCIAL ACCEPTANCE
Description Actual social perception of LNG as a product with some degree of risks, makes necessary to elaborate environmental and social management plans targeting a great public audience, in order to avoid a negative social impact.
Leader Enagás
Beneficiaries Enagás
Deliverable/ Supporting document Folia Study on LNG Social Perception

Activity Description

Activity Update

Final report

ET6 STUDY LNG ADVANCE TRAINING REQUIREMENTS AND VOCATIONAL PROGRAMME
Description Establish training needs and levels both on shore and at sea. Establish accreditation process. Analysis of employees needed to provide the service.
Leader Universidad Politécnica de Madrid
Beneficiaries Enagás, Universidad Politécnica de Madrid, Sociedad de Salvamento y Seguridad Marítima (SASEMAR), Reganosa, Universidade de Santiago de Compostela
Deliverable/ Supporting document Activity Description

Activity Update

Final report

WP2.2 Feasibility

EV1 ENGINEERING FOR NEW DEDICATED LNG JETTY IN REGASIFICATION PLANT OF FERROL
Description Feasibility study for a new jetty for LNG bunkering
Leader Reganosa
Beneficiaries Reganosa, Autoridad Portuaria de Ferrol-San Cibrao
Deliverable/ Supporting document Activity Description

Activity Update

Final report

EV2 RESCUE BOAT POWERED BY LNG
Description Feasibility study of LNG as a marine fuel for maritime rescue fleet. Technology developments monitoring.
Leader Sociedad de Salvamento y Seguridad Marítima (SASEMAR)
Beneficiaries Sociedad de Salvamento y Seguridad Marítima (SASEMAR), Astilleros Armón
Deliverable/ Supporting document Link to study

Activity Description

Activity Update

Final Report

EV3 PORT LOCOMOTIVE POWERED BY LNG (TARRAGONA)
Description Evaluate the technical, the legal and the financial feasibility of implementing liquefied natural gas (LNG) in railway traction within the port domain (shunting locomotives), in order to pave the way towards the introduction of a more sustainable alternative to current diesel technology in an environment with increasingly stringent environmental requirements.
Leader Autoridad Portuaria de Tarragona
Beneficiaries Autoridad Portuaria de Tarragona
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable Port Tarragona

EV4 TUGBOAT POWERED BY LNG (BARCELONA)
Description Feasibility study for the construction of a natural gas-powered tugboat, designed specifically for the characteristics of the ports of the Western Mediterranean.
Leader Autoridad Portuaria de Barcelona
Beneficiaries Autoridad Portuaria de Barcelona, UTE Remolcadores Barcelona-SAR
Deliverable/ Supporting document Activity Description

Activity Update

EV5 ADAPTATION FOR LNG BUNKERING/SMALL SCALE SERVICES IN REGASIFICATION PLANT OF SAGUNTO.
Description Technical and Financial feasibility analyses of the compatibility and adaptation of SAGGAS facilities.
Leader Fundación Valenciaport
Beneficiaries Fundación Valenciaport, Autoridad Portuaria de Valencia, Planta de Regasificación de Sagunto (SAGGAS)
Deliverable Activity Description

Activity Update

Deliverable

EV6 TUGBOAT POWERED BY LNG (VALENCIA)
Description Design a LNG fuelled tug boat. The ship will also implement other innovative technologies addressed to improve her optimal use of power. The scope of this prototype will only cover the basic engineering.
Leader Fundación Valenciaport
Beneficiaries Fundación Valenciaport, Autoridad Portuaria de Valencia, SEAPLACE, BOLUDA, Bureau Veritas
Deliverable/ Supporting document Activity Description

Activity Update

Final report, Engineering

EV7 MULTIMODAL LNG BUNKER BERTH IN PORT OF HUELVA
Description Study alternatives of a bunker berth in the Port of Huelva, with a multimodal view and, once selected the best option, produce a basic project.
Leader Autoridad Portuaria de Huelva
Beneficiaries Autoridad Portuaria de Huelva, Enagás
Deliverable/ Supporting document Activity Description

Activity Update

Final report

Activity 3: Studies w/integrated Pilot

WP3.1 CNC Mediterranean

EPM1 BARCELONA: DEDICATED LNG FLEXIBLE HOSES FOR BUNKERING
Description Adapt small scale jetty for using flexible hoses to bunker LNG powered ships and supply LNG feeder barges. Test technical feasibility.
Leader Enagás
Beneficiaries Enagás, Autoridad Portuaria de Barcelona
Deliverable/ Supporting document Activity Description

Activity Update

EPM2 BARGE RETROFIT FOR LNG BUNKERING WITHIN THE PORT
Description Transformation of an existing barge to supply LNG to vessels.
Leader Autoridad Portuaria de Barcelona
Beneficiaries Autoridad Portuaria de Barcelona, SUARDIAZ, CEPSA, HAM, Bureau Veritas
Deliverable/ Supporting document Activity Description

Activity Update

EPM3 STRADDLE CARRIER RETROFIT
Description Design and conversion of two straddle carriers to be powered by LNG.
Leader Autoridad Portuaria de Barcelona
Beneficiaries Autoridad Portuaria de Barcelona, HAM, Gas Natural Fenosa, IDIADA, Terminal de Contenidors de Barcelona, BEST
Deliverable/ Supporting document Activity Description

Technical feasibility study

Activity Update

EPM4 CARTAGENA: DEDICATED LNG MOORING JETTY FOR SMALL SCALE SERVICES
Description Adapt small scale jetty to be able to supply vessels from 1,000 m3
Leader Enagás
Beneficiaries Enagás, Autoridad Portuaria de Cartagena
Deliverable/ Supporting document Activity Description

Activity Update

EPM5 LNG/CNG MIXED STATION FOR VEHICLES AND SMALL BOATS
Description Construction of a satellite LNG terminal to supply ships, vehicles and other mobile material.
Leader Fundación Valenciaport
Beneficiaries Molgas Energía, Autoridad Portuaria de Valencia, Fundación Valenciaport
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable LNG Station projects with annexes

WP3.2 CNC Atlantic

EPA1 ADAPTATION FOR LNG SMALL SCALE SERVICES IN BIG SCALE JETTY
Description Modification of the exiting mooring jetty in BBG.
Leader Ente Vasco de la Energía (EVE)
Beneficiaries Gas Bunker Supply (ITSAS), Ente Vasco de la Energía (EVE)
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable

EPA2 BARGE RETROFIT FOR LNG BUNKERING IN THE CANTABRIAN COAST
Description Adaptation of an existing ship to LNG bunker barge.
Leader Ente Vasco de la Energía (EVE)
Beneficiaries Gas Bunker Supply (ITSAS), Ente Vasco de la Energía (EVE)
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable

EPA3 BILBAO: NEW TUGBOAT POWERED BY LNG
Description Development of a LNG powered harbour TUG and its incorporation to Bilbao port tugs service.
Leader Ente Vasco de la Energía (EVE)
Beneficiaries Ibaizabal, Ente Vasco de la Energía (EVE)
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable

EPA4 ADAPTATION FOR LNG MIXED BUNKER/BIG/SMALL SCALE SERVICES IN EXISTING JETTY
Description Solutions to supply LNG in the short term (while EV1 develops).
Leader Reganosa
Beneficiaries Reganosa
Deliverable/ Supporting document Activity Description

Activity Update

Final Report Mugardos

WP3.3 Transversal

EPT1 LNG POWERED ELECTRICITY GENERATOR MOBILE UNIT FOR OPS
Description Design and installation of a mobile gas generating unit.
Leader Autoridad Portuaria de Barcelona
Beneficiaries Autoridad Portuaria de Barcelona, Autoridad Portuaria de Tenerife, Autoridad Portuaria de Vigo, SUARDIAZ, Bureau Veritas, HAM, Guascor Power (Dresser-Rand-A Siemens Business)
Deliverable/ Supporting document Activity Description

Activity Update

Technical analysis

Deliverable

EPT2 MULTIMODAL TRANSPORT FOR LNG LOGISTICS SUPPLY CHAIN (RAIL/ROAD/SEA)
Description Study the technical and economic feasibility of multimodal LNG transport. Transport an ISO container using the three modes.
Leader Enagás
Beneficiaries Enagás, Autoridad Portuaria de la Bahía de Algeciras, Autoridad Portuaria de Huelva, Autoridad Portuaria de Cartagena, Autoridad Portuaria de Melilla, Renfe, Cepsa
Deliverable/ Supporting document Activity Description

Activity Update

Deliverable EPT2 Isocontenedor Analisis tecnico economico